1.Communicate with the other party before construction to build a construction platform to ensure the safety of construction personnel (try to complete it before entering the factory)

Confirm the construction platform construction method and requirements to ensure its stability and safety.

Communicate with the other party and obtain necessary permits and assistance to ensure smooth construction progress.

Provide safety training and reminders to construction personnel, understand and comply with safety regulations.

2.Use a crane to lift the frame to the construction platform. The frame is installed in three parts, with expansion screws on the left and right sides fixed to the large wall. The middle part is connected to the two sides by bolts, connecting the three parts of the frame together

Prepare the necessary tools and materials, including cranes, frames, electric drills, expansion screws, bolts, etc.

Operate the crane to smoothly lift the frame onto the construction platform and ensure that the frame is securely placed.

Divide the installation into three parts, first install the left and right parts, and fix them to the large wall using expansion screws.

Install the middle section and connect it to both sides with bolts to ensure that the three parts are firmly connected together.

3.Use a crane to lift the frame to the construction platform. The frame is installed in three parts, with expansion screws on the left and right sides fixed to the large wall. The middle part is connected to the two sides by bolts, connecting the three parts of the frame together

Prepare the necessary tools and materials, including cranes, frames, electric drills, expansion screws, bolts, etc.

Operate the crane to smoothly lift the frame onto the construction platform and ensure that the frame is securely placed.

Divide the installation into three parts, first install the left and right parts, and fix them to the large wall using expansion screws.

Install the middle section and connect it to both sides with bolts to ensure that the three parts are firmly connected together.

4.Installing the motor drive system

Prepare the necessary tools and materials according to the requirements of the motor drive system.

Install the motor drive system according to the instructions or relevant specifications, ensuring correct connection of power and control circuits.

5.Install cleaning system

Prepare the necessary tools and materials according to the requirements of the cleaning system.

Install the cleaning system according to the instructions or relevant specifications to ensure proper connection of water sources and spray pipes.

6.Electrical circuit installation

Prepare the necessary tools and materials according to the requirements of the electrical circuit.

Install the circuit according to the design drawings or relevant specifications, including power lines, control lines, signal lines, etc.

Pay attention to the routing and layout of the line to ensure neatness, safety, and reliability.

7.Installation of water system (determine the installation position of water tank and water pipeline in advance)

Prepare the necessary tools and materials according to the requirements of the waterway system.

Install the waterway system according to the design drawings or relevant specifications, including water pipes, water tanks, etc.

Pay attention to the connection and layout of water pipes to ensure they do not leak or affect the environment.

8.Overall equipment debugging and operation

After completing all the above steps, proceed with the overall debugging and operation of the equipment.

Check the working status of various systems, including electrical, water, mechanical, and other parts.

Conduct equipment debugging and operation to ensure that the equipment can operate normally and achieve the expected results